Corporate Clients - Completed Projects
Our team have completed several projects maintaining the highest of quality and safety. Below are a select few that we have done.
Design on Apple, Full corrugated application

Clients name: Design on Apple
Location: Sandton, Johannesburg
Application Type: Full corrugated roof application
Size: 2600sqm
Turn around time: 3 Weeks
Before Images

Full corrugated roof application before

After Images

Full corrugated roof application after

Sun City Resort, Cascades Hotel, Bocado Restaurant - Concrete Waterproofing

Zero Snags reported on handover to client. Flood Tests completed, and material in tact. The original design of the building encouraged a water feature look and feel, and as such there was not sufficient drainage on the roof, with vast amounts of foliage and animal matter clogging the area, water ingress is bound to occur as a result. The existing waterproofing had reached it’s life span, and with the mass amounts of water sitting on top of the roof, experienced cohesive failure and prominent leaks throughout, As such, teams cleaned the area and created drainage points, and prepared adequate waterproofing measures to ensure no further water ingress would occur. The area had been water logged and leaking, to completely waterproofed, reinstated and intact within 17 days from the start of project

Before

After

Before

After

Applying New Screed

Applying New Screed

Applying Material

Painting
Sun City Resort, Cascades Hotel, Luma Bar - Waterproofing & Remedial Tiling, full turnkey service

Zero Snags reported on handover to client. Flood Tests completed, and material in tact. As a result of faulty waterproofing, damages were experienced in the restaurant below, and subsequently affected the topside tiling. All existing tiling and waterproofing material is removed, and reinstated with material and Natural Marble Stone tiles.

Before

Before

After

After

Removal of old tiles

Removal of old tiles

Applying New Screed

Applying New Screed

Applying Material

Applying Material

Laying New Tiles

Laying New Tiles
The Maslow Hotel - Concrete Waterproofing

Zero Snags reported on handover. Flood Tests completed, and material in tact. Area taken from flaking bitumen and prominent leaks throughout, to completely waterproofed and intact within one month from the start of project.




The Cascades Hotel - Concrete Waterproofing & Rope Access Application

Flood Tests completed, and material in tact. Existing waterproofing had experienced cohesive failure and prominent leaks throughout, to completely waterproofed, reinstated and intact within 10 days from the start of project.

Before

Before

Before

Before

After

After

After

After

Cleaning Area

Rope Access

Application

Application
The Cascades Hotel - Corrugated Roof Waterproofing

Zero Snags reported on handover to client. Flood Tests completed, and material in tact. Existing waterproofing had experienced cohesive failure and prominent leaks throughout, to completely waterproofed, reinstated and intact within 12 days from the start of project.

Before

Before

Cleaning of Area

Cleaning of area

Application

Application

Complete

Complete

Complete
The Cascades Hotel , Level 5 - Concrete Slab Waterproofing

The previous waterproofing material had reached it’s lifespan, and was no longer provide adequate coverage. Our team coated the roof effectively and resolved the underlying issues. Project handed over to client within time frame, and done in accordance with the prestigious annual Gary Player Golf Tournament, with no disturbances to the event or guests.

Before

Before

Before

Before

Application

After

Complete

Complete

Complete
The SOHO Hotel - Waterproofing & Remedial Paving, full turnkey service

Zero Snags reported on handover to client. Flood Tests completed, and material in tact. As a result of faulty waterproofing, damages were experienced in the rooms below, and subsequently affected the topside paving. All existing paving and waterproofing material is removed, and replaced with material and precision paving.

Before

After

Before

After
Fourways Crossing Shopping Centre - Expasion Joint Waterproofing

The previous waterproofing system that was installed, was experiencing cohesive failure. The UV stability of the existing material was also questionable, and as a result could not tolerate the harsh South African environment, as well as the constant flow of heavy vehicle traffic. The material was removed, and our expansion joint system was installed, along with Steel Plates to ensure the longevity of the material.

Before

Before

Applied

After
Sun Central Conference Centre - Waterproofing & Remedial Paving, full turnkey service

Zero Snags reported on handover to client. Flood Tests completed, and material in tact. Due to the inconsistent existing waterproofing material in place, the tenants below experienced large flooding volumes during seasonal rain. The paving above did not accommodate for a concealed expansion joint, and subsequently the bricks moved consistently. Within 14 days the existing paving and waterproofing was removed, and replaced, thereafter being handed by to the client, with no snags reported.

The removal of paving

Area leveled and prepared

Application prior to paving

Before

Before

After

After
Sun Central Conference Centre - Corrugated Roof Waterproofing

Zero Snags reported on handover to client. Flood Tests completed, and material in tact. Insufficient waterproofing coverage, and existing gutter material experiencing cohesive failure, the corrugated sheeting required urgent waterproofing attention. With vast amounts of foliage and animal matter clogging the gutters, water ingress is bound to occur as a result. As such, teams cleaned and maintained the gutters, and prepared adequate waterproofing measures to ensure no further water ingress would occur.

Before

After

Insufficient Maintenance, and excessive foliage in the gutters will create water overflow, and water ingress.

Area cleaned and Material Applied

Gutter Application

Gutter Application
Sun Central Entertainment Centre - Corrugated Roof Waterproofing

Zero Snags reported on handover to client. Flood Tests completed, and material in tact. Insufficient waterproofing coverage, and existing gutter material experiencing cohesive failure, the corrugated sheeting required urgent waterproofing attention. As such, teams overhauled the roof, and installed the material, providing instant results.

Rope Access

Rope Access

Gutter Application

Corrugated Application

Corrugated Application

Corrugated Application

Completed

Completed
Vaal Mall Shopping Centre - Concrete Slab Waterproofing

Zero Snags reported on handover to client. Flood Tests completed, and material in tact. The previous waterproofing application had reached it’s lifespan, and was unable to provide sufficient coverage for the parking lot. As a result of the failures, the tenants below were experiencing flooding at regular intervals. All existing material was removed, the slab was re-coated with our waterproofing material, and then an Asphalt coating was applied as an effective mechanical. Application completed ahead of schedule.

Application

Application

Asphalt being applied directly after the material is installed .

Application
Gary Player Golf Course - Parapet Walls

A case study completed on the efficacy of material in comparison to other waterproofing materials, with results proving to be immediate. Existing waterproofing materials will experience cohesive failure, whereas our material is incapable of such.

Before

Before

After

After
Case Study: The various stages of a site
A case study completed on the efficacy of our materials in comparison to other waterproofing materials, with results proving to be immediate. Existing waterproofing materials will experience cohesive failure, whereas the our material is incapable of such.

Flat Concrete Roof